TIWN

KAMALPUR, March 6 (TIWN): The same old tradition of TSECL, Kamalpur division got whistled off at the year ending today. The authority happily announced and cut the power for the whole day in the name of renovation works.
After a long waiting, the TSECL authority ultimately showed their familiar and old trick of pocketing money from today, here at Kamalpur. Last evening, the authority announced that, the power supply would be unavailable for the whole day. And it would happen for the renovation works.
As enquired of, the local authority made it clear that, as the season of storm had approached hence they would continue such works to clear the obstacles near the poles and over the line. And it would reduce the possibility of damage.
Now, it became evident from the past experience that, even after repeated such announcements, claims and works, each and every storm impose some heavy damages over the connectivity. More importantly, such works continued till the Puja. Last year, the Vigilance and the Audit team several times visited this division and found some major loopholes and embezzlements.
It remained a different saga as, if the thief dwelt with the cop, then how theft could be stopped. And this year as the tradition began; it would also not be mere works, as speculated by the commoners.
- First Locomotive Electric Train reached Tripura
- Leader of the Opposition visits his constituency
- 70-year-old farmer was killed after being hit by Vehicle in Sepahijala
- ‘Bangladesh built Dam in Kalapania, causing Water-Logging in Agartala’ : Mayor
- Inter-ST Hostel Football competition begins to motivate young generation against Drug-abuses