TIWN May 2, 2018
AGARTALA, May 2 (TIWN): Union Minister for Power and Renewable energy , R.K.Singh has assured all kinds of helps from the central govt in power connectivity development, advising the state govt to implement the central projects fully.
State and Centre work cooperatively always and if the vision is clear then nobody can stop the projects to be fulfilled, but once the connectivity is given, there should be no halting in the power accessibility”.
The Minister also placed J&K, Uttarakhand like places where power reached each places.
The Minister also asked the Power dept officials to calculate how many days in a year and how many days they will take to complete the projects. The Minister was addressing at Prgana Bhawan on the launching programme of Saubhagya Scheme in Tripura.
- BJP leader Kajal Das was arrested after a Video reeled Viral on Social Media during an Attack on the Presiding Office on East Tripura Lok Sabha Poll day
- Hotel manager was attacked by youths centering power-cut
- 1 critical after road accident in Bishalgarh By-Pass road
- Power outage rattles public lives across Kailashahar : Protest for water continues
- Massive fire left two injured in Dharmanagar